Design-build means the people who draw it are the people who build it. No handoff between an architect's office and a contractor's site — one team, one schedule, one point of accountability.
That's what closes the gap between an 11-month build and an 18-month one. Every stage below is tracked against the schedule we hand you at contract signing, not revised quietly as we go.
Topographic survey, soil test, and boundary verification before a single design line is drawn.
Cut to design levels, shoring where the soil report calls for it, spoil removed same-day.
Footings poured to the structural engineer's spec, cured, and inspected before framing starts.
Structural skeleton up floor by floor, with a third-party structural inspection at every level.
Walls, roof, and glazing close the building in while electrical and plumbing rough-in runs in parallel.
Snag list walked with the client in person, closed out item by item before the keys change hands.
A row of eight townhomes on a former industrial lot, delivered a month ahead of contract.
A ground-up outpatient clinic, built to shell-and-core in ten months and fit out in four.
A 22-unit low-rise, framed in cross-laminated timber to hit a tighter carbon target.
“We got the same six-stage schedule at the kickoff meeting that we got at handover. Nothing on it moved without a call first.”
“The weekly log meant we never had to chase anyone for an update — it just showed up, every Friday, whether the news was good or not.”
“Third-party inspection at every framing level sounded like overkill until our lender asked for exactly that documentation at draw three.”