01 / 06 Site Survey
Add construction-timelapse.mp4 next to this file to activate the scroll-scrub video.
Design-Build · Est. 2007

From bare land to
move-in ready, on record.

Foundry & Frame is a design-build contractor. Scroll to watch one of our sites go from a survey peg to a handover key — the same six-stage process behind every job we take on.

Licensed & Insured OSHA 30 Certified Crews ISO 9001:2015
Scroll to build
Trusted for permits, draws & inspections by
MERIDIAN BANK CITY PLANNING COMMISSION STRUCTURAL ENGINEERS COUNCIL HARTLEY & COLE ARCHITECTS
0yrs
Design-build experience
0+
Projects delivered
0mo avg
Land to handover
ZeroLTI
Lost-time incidents, 2024
The Approach

One team, from the
first survey peg to the keys.

Design-build means the people who draw it are the people who build it. No handoff between an architect's office and a contractor's site — one team, one schedule, one point of accountability.

FIXED SCHEDULE ONE CONTRACT WEEKLY REPORTING

That's what closes the gap between an 11-month build and an 18-month one. Every stage below is tracked against the schedule we hand you at contract signing, not revised quietly as we go.

The Process

Six stages, one fixed schedule.

The same sequence you scrolled through above, tracked site by site and shared with every client on a weekly log.
01

Site Survey

Topographic survey, soil test, and boundary verification before a single design line is drawn.

02

Excavation

Cut to design levels, shoring where the soil report calls for it, spoil removed same-day.

03

Foundation

Footings poured to the structural engineer's spec, cured, and inspected before framing starts.

04

Framing

Structural skeleton up floor by floor, with a third-party structural inspection at every level.

05

Envelope & MEP

Walls, roof, and glazing close the building in while electrical and plumbing rough-in runs in parallel.

06

Finishing & Handover

Snag list walked with the client in person, closed out item by item before the keys change hands.

The Difference

What a fixed process actually changes.

Every row below is something a client has told us they didn't get from a previous contractor.
Foundry & Frame
Typical Contractor
Fixed six-stage schedule at signing
Schedule revised as the job goes
One team, design through build
Handoff between architect and builder
Weekly progress log, shared by default
Updates only when you call and ask
Third-party inspection at every framing level
Inspection only at code checkpoints
Fixed-price contract
Change orders as the default
Recent Work

A few sites we've closed out.

Every project below shipped on the six-stage schedule agreed at signing.
Residential View Case Study →

Kestrel Row

RESIDENTIAL · 8 UNITS · 9 MO

A row of eight townhomes on a former industrial lot, delivered a month ahead of contract.

Commercial View Case Study →

Millbrook Clinic

COMMERCIAL · 12,000 SQFT · 14 MO

A ground-up outpatient clinic, built to shell-and-core in ten months and fit out in four.

Residential View Case Study →

The Aldermere

RESIDENTIAL · 4 STOREY · 13 MO

A 22-unit low-rise, framed in cross-laminated timber to hit a tighter carbon target.

From Our Clients
“We got the same six-stage schedule at the kickoff meeting that we got at handover. Nothing on it moved without a call first.”
DNDevika N.CLIENT, MILLBROOK CLINIC
“The weekly log meant we never had to chase anyone for an update — it just showed up, every Friday, whether the news was good or not.”
RKRahul K.OWNER, THE ALDERMERE
“Third-party inspection at every framing level sounded like overkill until our lender asked for exactly that documentation at draw three.”
SPSarah P.DEVELOPER, KESTREL ROW
Start a Project

Tell us about the land you're building on.

Send the basics and we'll call within one business day to schedule a site walk — no obligation, no hard sell.

Office[Address line 1], [City, State]
Phone+91 [XXXXX XXXXX]
Emailhello@foundryframe.example